CompletedNot a drug-phase studyRelapsing MSNCT07101653

What it found

Result in a paper, not read yet

A paper reports the results; we have not read it yet. See Papers below.

What was tested

Treatment tested

  • Exercise

What it measured

Main measures

  • MRI Acquisition and Volumetric Analysis

    12 weeks

    MRI lesions
  • Serum irisin hormone measurement

    12 weeks

Other measures (1)

  • Multiple Sclerosis Functional Composite

    12 weeks

    Disability progression

Who could take part

Relapsing MS · 19 to 65

Inclusion Criteria: * Clinically confirmed relapsing-remitting multiple sclerosis (RRMS) diagnosis according to revised McDonald criteria (2017) * Aged 19-65 years (inclusive) * Mild-to-moderate disability (EDSS score 1.0-5.5) * No corticosteroid treatment within the previous 3 months Exclusion Criteria: * Acute MS relapse within 90 days prior to enrollment * Regular participation in structured exercise programs (>3 hours/week) * Comorbid conditions that may limit exercise participation, including; significant orthopedic impairments, unstable cardiopulmonary conditions and other systemic disorders affecting physical activity * Standard MRI contraindications (metallic implants, claustrophobia, etc.) * Concurrent neurological disorders (other than MS) * Initiation or modification of disease-modifying therapy within 6 months * Severe spasticity (Modified Ashworth Scale ≥3 in any major muscle group)

As registered. Criteria can change, so ask the trial team or your neurologist.

About this trial

In the sponsor's words

This single-blind, randomized controlled trial will employ a two-arm parallel design (exercise group vs. control group) with a 12-week intervention period. Sex-stratified randomization will be implemented using SPSS 25.0 (IBM Corporation, Armonk, NY, USA) to ensure balanced group allocation. All outcome measures will be assessed at baseline and post-intervention.

Papers

Loading reviews and guidelines…

History

    1. Started

      Oct 2024

    2. Main results due

      Nov 2024

    3. Finished

      Jun 2025

    Assembled by software from public sources and not checked by people. Each record links to its source. Report an error