Stopped earlyPhase 3Progressive MSNCT00468611

What it found

Stopped: not working

The trial was stopped early because the treatment was not working.

Reason given: Negative efficacy results of the MAESTRO-01 study

This trial finished 17 years ago. We found no results in the registry or in any paper that cites it.

What was tested

Treatment tested

  • Dirucotide

What it measured

Main measures

  • Time to progression of disease in subjects with SPMS as measured by the EDSS after 24 months of treatment

    24 Months

    Disability progression

Other measures (1)

  • To assess the safety of MBP8298, degree of change in the EDSS scores, effect of MBP8298 on MRI parameters, difference in relapse rates, effect on MSFC, subject's quality of life (MSQoL54) and fatigue (MFIS) after 24 months of treatment

    24 Months

    Disability progressionRelapsesMRI lesionsFatigueQuality of life (reported by participants)Safety

Who could take part

Progressive MS · 18 to 65

Inclusion Criteria: * Male of female subjects, 18-65 years of age with a diagnosis of SPMS * HLA DR2 and/or DR4 positive * Absence of a relapse in the 3 months prior to baseline * EDSS of 3.0 - 6.5 Exclusion Criteria: * Therapy with Beta-interferon, glatiramer acetate within 3 months or mitoxantrone, cyclophosphamide, methotrexate, azathioprine or any immune modulating or immunosuppressive drugs within 6 months of baseline * Treatment with Tysabri within 2 years of baseline * Females who are breast feeding, pregnant (pregnancy test at baseline) or not using a medically approved method of contraception regularly Other protocol-defined inclusion/exclusion criteria may apply.

As registered. Criteria can change, so ask the trial team or your neurologist.

About this trial

In the sponsor's words

This study will assess the efficacy and safety of MBP8298 compared to placebo in subjects with Secondary Progressive Multiple Sclerosis (SPMS)

Papers

    Loading reviews and guidelines…

    Related trials

    History

      1. Started

        Jun 2007

      2. Main results due

        Jul 2009

      3. Finished

        Sept 2009

      Assembled by software from public sources and not checked by people. Each record links to its source. Report an error