CompletedPhase 4Relapsing MSNCT01591551

What it found

No result found

We found no results in the registry or in papers.

This trial finished 13 years ago. We found no results in the registry or in any paper that cites it.

What was tested

Treatment tested

  • Natalizumab

    Integrin alpha-4/beta-1 inhibitor|Integrin alpha-4/beta-7 inhibitor

What it measured

Main measures

  • Change in parameters of sleep as measured by polysomnography and multi-sleep latency test over 6 months of Natalizumab treatment.

    Baseline and 6 months

    Myelin repairMood and sleep

Other measures (2)

  • Change in neurocognition parameters over 6 months of Natalizumab treatment and correlation with changes in sleep efficiency.

    Baseline and 6 months

    Thinking and memoryMood and sleep
  • Change in subjective measures of fatigue, sleepiness and mood over 6 months of Natalizumab treatment and correlation with changes in sleep efficiency.

    Baseline and 6 months

    FatigueMood and sleep

Who could take part

Relapsing MS · 18 to 65

Inclusion Criteria: * Relapsing form of multiple sclerosis * Able to give informed consent and committed to follow the protocol * EDSS from 0 to 6.0 * Epworth Sleepiness Scale > 9 or Modified Fatigue Impact Scale > 30 or Fatigue Severity Scale > 4 * Age range of 18 - 65 years of age * Naïve to Natalizumab * Enrolled in the TOUCH program Exclusion Criteria: * Severe cognitive impairment * Coexisting severe medical condition * Inability to speak English or read * Inability to give valid informed consent.

As registered. Criteria can change, so ask the trial team or your neurologist.

About this trial

In the sponsor's words

The purpose of this study is to assess the impact of Natalizumab (Tysabri) therapy on sleep efficiency, total sleep time and sleep latency, in Multiple Sclerosis (MS) patients receiving Natalizumab for 6 months relative to baseline.

Papers

    Loading reviews and guidelines…

    Related trials

    History

      1. Started

        Mar 2012

      2. Main results due

        Aug 2013

      3. Finished

        Aug 2013

      Assembled by software from public sources and not checked by people. Each record links to its source. Report an error