The Influence of a tDCS Combined Long-term Motor Training Program on Structural White Matter Changes in the Brain, Functionality and Psychological Outcome Measures in Multiple Sclerosis.

Stopped earlyNot a drug-phase studyMS (type not specified)NCT01279655

What it found

Stopped

The trial ended early for another reason (see below).

This trial finished 14 years ago. We found no results in the registry or in any paper that cites it.

What was tested

Treatment tested

  • tDCS
  • Bimanual Training

What it measured

Main measures

  • Change in White Matter

    Baseline, immediately after and 3 weeks after the intervention

    MRI lesionsMyelin repair

Other measures (2)

  • Change in Quality of Life

    Baseline, immediately after and 3 weeks after the intervention

    Quality of life (reported by participants)
  • Blood sample

    After the end of the study

Who could take part

MS (type not specified) · 18 to 68 · EDSS 2 to 6.5

Show the full criteria

Inclusion criteria

* Expanded Disability Status Scale (EDSS) scores between 2 and 6.5 * Stable MS (no relapse during the last 3 months before study onset) * age: between 18 and 68 years

Exclusion criteria

* Patients with other pathologies associated with peripheral and/or central sensory dysfunction or under psychotropic or antiepileptic medication. * Standard TMS/tDCS and MRI exclusion criteria (safety questionnaires)

As registered. Criteria can change, so ask the trial team or your neurologist.

About this trial

In the sponsor's words

In the current study the researchers will firstly investigate whether a bimanual coordination training protocol (20 min/day, for 8 consecutive weeks) correlates with changes in white matter architecture and improved upper-limb functionality in patients with multiple sclerosis. Secondly, the researchers predict that motor learning is more efficient when it is combined with anodal transcranial direct current (tDCS) stimulation on the left primary motor cortex.

Loading reviews and guidelines…

History

    1. Started

      Jan 2011

    2. Main results due

      Dec 2011

    3. Finished

      May 2013

    Assembled by software from public sources.