Pilot Study on the Effect of the Free From Falls Program on Falls in People With Multiple Sclerosis

CompletedNot a drug-phase studyMS (type not specified)NCT01829776

What it found

No results found

We found no results in the registry or in papers.

This trial finished 12 years ago. We found no results in the registry or in any paper that cites it.

What was tested

Treatment tested

  • Educational intervention

What it measured

Main measures

  • Change in fall frequency per month (30 days)

    difference between the wait period before the 8 week FFF program and the 8 weeks after the end of the 8 week FFF program

    Walking and mobility

Other measures (1)

  • Relationship between paper and electronic fall calendars

    5 months

    Walking and mobility

Who could take part

MS (type not specified) · 18 to 89

Show the full criteria

Inclusion criteria

* MS of any type * Age 18 years or older * Able to walk at least 100 meters with intermittent or unilateral constant assistance (cane, crutch or braces) with or without resting * Self-reported history of 2 or more falls in the previous 2 months * Clinically stable MS with no relapses within 30 days * Willing to provide informed consent * Fluent in written and spoken English. * Daily access to email and willing to respond to a daily email questionnaire

Exclusion criteria

* Serious psychiatric or medical conditions that would preclude reliable participation in the study.

As registered. Criteria can change, so ask the trial team or your neurologist.

About this trial

In the sponsor's words

This pilot study will compare how often people with multiple sclerosis (MS) fall before participating in the Free From Falls (FFF) educational program, during the program, and for 8 weeks after the program. The protocol will also evaluate the accuracy, efficiency and convenience of an email survey to count how often people fall.

Papers

    Loading reviews and guidelines…

    History

      1. Started

        Apr 2013

      2. Main results due

        Sept 2014

      3. Finished

        Sept 2014

      Assembled by software from public sources.