A Phase II, Multicentre Study to Evaluate the Long-term Safety and Efficacy of MT-1303 in Subjects With Relapsing-remitting Multiple Sclerosis Who Have Completed the MT-1303-E04 Study

CompletedPhase 2Relapsing MSNCT018906552012-002639-27

What it found

Main goal was not benefit

The main measure was safety, drug levels or similar, not whether the treatment works.

“One or more adverse events were reported in 303 (82.6%) of 367 patients: 'headache', 'lymphocyte count decreased', 'nasopharyngitis' and 'MS relapse' were most common (14.7%-16.9%).”
Read by software from the paper's abstract

96 weeks

Total participants: 415

Read by software from the paper's abstract

What was tested

Treatment tested

  • Amiselimod
  • MT-1303-Middle

What it measured

Main measures

  • Safety assessments

    Month 18

    Safety
  • Safety Assessments

    Safety

Other measures (3)

  • Clinical efficacy

    Month 18

    Relapses
  • Magnetic Resonance Imaging (MRI)

    Month 18

    MRI lesionsBrain volume loss
  • Clinical Efficacy Endpoints:

Who could take part

Relapsing MS · 18 to 60

Show the full criteria

Inclusion criteria

* Completion of the 24-week treatment period in MT-1303-E04 as per protocol * Able to provide written informed consent and to comply with the requirements of the protocol * For males and females of reproductive potential, two methods of contraception must be used throughout the study and for 12 weeks after cessation of study medication. At least one of the methods of contraception must be a barrier method.

Exclusion criteria

* Permanent discontinuation of study medication prior to the end of treatment (EOT) visit in MT-1303-E04 * Newly diagnosed diabetes mellitus during MT-1303-E04

As registered. Criteria can change, so ask the trial team or your neurologist.

About this trial

In the sponsor's words

To evaluate the long-term safety and tolerability of MT-1303 in subjects with relapsing remitting multiple sclerosis (RRMS).

Papers

Loading reviews and guidelines…

Related trials

History

    1. Started

      Aug 2013

    2. Main results due

      Mar 2016

    3. Finished

      Mar 2016

    Assembled by software from public sources.