Effect of Motor Cortex Magnetic Stimulation Versus Sacral Magnetic Stimulation in Lower Urinary Tract Dysfunction in Multiple Sclerosis Patients

CompletedNot a drug-phase studyMS (type not specified)NCT03434873

What it found

No results found

We found no results in the registry or in papers.

This trial finished 11 years ago. We found no results in the registry or in any paper that cites it.

What was tested

Treatment tested

  • magnetic stimulation

What it measured

Main measures

  • Change from baseline King's Health QoL questionnaire score after treatment

    1-7 days after treatment

    Bladder, bowel and sexual functionQuality of life (reported by participants)
  • Change from baseline Post-void residual urine after treatment

    1-7 days after treatment

    Bladder, bowel and sexual function
  • Change from baseline Maximum Cystometric Capacity (MCC) after treatment

    1-7 days after treatment

    Bladder, bowel and sexual function
  • Change from baseline Maximum Flow Rate (Qmax) after treatment

    1-7 days after treatment

  • Change from baseline Detrusor pressure at maximum flow rate (Pdet @Qmax) after treatment

    1-7 days after treatment

Who could take part

MS (type not specified) · 18 to 45

Show the full criteria

Inclusion criteria

* Multiple Sclerosis patients (diagnosed by McDonald criteria 2010) with lower urinary tract dysfunction * Adults more than 18 years * Unresponsiveness to medical treatment * Urodynamic diagnosis of detrusor overactivity and/or detrusor underactivity and/or detrusor-sphincter dyssynergia

Exclusion criteria

* Urinary tract infections * Pregnancy

As registered. Criteria can change, so ask the trial team or your neurologist.

About this trial

In the sponsor's words

This work is intended to assess the effect of repetitive magnetic stimulation on the sacral roots versus repetitive magnetic stimulation on motor cortex in multiple sclerosis patients with the lower urinary tract dysfunction.

Loading reviews and guidelines…

History

    1. Started

      Oct 2014

    2. Main results due

      Apr 2015

    3. Finished

      Apr 2015

    Assembled by software from public sources.