Effect of Life Kinetik Training on Lower Limb Coordination in Ataxic Patients

CompletedNot a drug-phase studyMS (type not specified)NCT06001424

What it found

No results found

We found no results in the registry or in papers.

This trial finished 5 years ago. We found no results in the registry or in any paper that cites it.

What was tested

Treatment tested

  • life kinetic exercises

Given to everyone in the trial

  • physical therapy

What it measured

Main measures

  • Lower Extremity Motor Coordination Test (LEMOCOT)

    at baseline

  • Lower Extremity Motor Coordination Test (LEMOCOT)

    post intervention (after one month)

Other measures (2)

  • Four Square Step Test (FSST)

    at baseline

    Walking and mobility
  • Four Square Step Test (FSST)

    post intervention (after one month)

    Walking and mobility

Who could take part

MS (type not specified) · 20 to 45

Show the full criteria

Inclusion criteria

* MS from both sexes * Patients' age will be ranged from 20 to 45 years * Expanded disability scale (EDSS) score ranging from "two" to "four"

Exclusion criteria

* Patients with Ataxia caused by other cause rather than MS * Patients with other neurological disease or orthopedic deformities may affect movement * Patients with cardiovascular and pulmonary diseases that make exercise unsafe * Patients with cognitive impairment or psychiatric disorders

As registered. Criteria can change, so ask the trial team or your neurologist.

About this trial

In the sponsor's words

Coordination is essential for the performance of most daily motor activities. Coordination problems are common in MS patients. One of the most commonly reported symptoms is dysmetria (limb ataxia). Ataxia is thought to occur in about 80% of MS patients. It leads to limitations in daily life activities. Aim of Study: to investigate the effect of life kinetik training on lower limb coordination in MS patients with ataxia.

Papers

Loading reviews and guidelines…

History

    1. Started

      Jun 2018

    2. Main results due

      Apr 2021

    3. Finished

      May 2021

    Assembled by software from public sources.