Effectiveness of Acupuncture Treatment Applied in Addition to the Rehabilitation Program in Multiple Sclerosis Patients

CompletedNot a drug-phase studyMS (type not specified)NCT06178029

What it found

Paper found, not read

A paper reports the results; we have not read it yet. See Papers below.

What was tested

Treatment tested

  • Acupuncture
  • Conventional Rehabilitation

What it measured

Main measures

  • Timed 25 Foot Walk Test Score

    Baseline, after 1 month and 3 month changes

    Disability progressionWalking and mobility

Other measures (4)

  • Neurogenic Bladder Symptom Scoring

    Baseline, after 1 month and 3 month changes

    Bladder, bowel and sexual functionQuality of life (reported by participants)
  • Incontinence Quality of Life Questionnaire

    Baseline, after 1 month and 3 month changes

    Bladder, bowel and sexual functionQuality of life (reported by participants)
  • Multiple Sclerosis Quality of Life-54 (MSQOL-54)

    Baseline, after 1 month and 3 month changes

    Quality of life (reported by participants)
  • Fatigue Severity Scale

    Baseline, after 1 month and 3 month changes

    Fatigue

Who could take part

MS (type not specified) · 18 to 65 · EDSS 1 to 6

Show the full criteria

Inclusion criteria

* Being diagnosed with MS according to McDonald criteria * EDSS score between 1-6 * The patient is clinically stable * Having not had a new MS attack in the last 3 months * Being cognitively suitable to participate in the study

Exclusion criteria

* Being clinically unstable * Inability to cognitively participate in tests * Having received acupuncture treatment in the last 6 months

As registered. Criteria can change, so ask the trial team or your neurologist.

About this trial

In the sponsor's words

The purpose of the study is to assess the effect of acupuncture treatment combinated with conventional rehabilitation methods on gait, fatigue, quality of life and bladder functions in patients with multiple sclerosis

Papers

Loading reviews and guidelines…

History

    1. Started

      Jun 2023

    2. Main results due

      Jan 2024

    3. Finished

      Apr 2024

    Assembled by software from public sources.