The Effect of Task Specific Physical Therapy for Persons With Advanced Multiple Sclerosis

Status unknownNot a drug-phase studyMS (type not specified)NCT06506929

What it found

No results found

We found no results in the registry or in papers.

What was tested

Treatment tested

  • Task specific physical therapy

What it measured

Main measures

  • Multiple Sclerosis Physical Frailty Functional Assessment (MSPFFA)

    Will be administered twice, once at pre-intervention and once at post-intervention. The length of the intervention is 6 weeks.

    Walking and mobility

Other measures (1)

  • Multiple Sclerosis Impact Scale-29 (MSIS29)

    Will be administered twice, once at pre-intervention and once at post-intervention. The length of the intervention is 6 weeks.

    Quality of life (reported by participants)

Who could take part

MS (type not specified) · 18 to 75 · EDSS 7.0 to 8.0

Show the full criteria

Inclusion criteria

1. definitive diagnosis of Multiple Sclerosis 2. Expanded Disability Status Scale (EDSS) of 7.0-8.0 3. Ability to read, understand , and sign an informed consent -

Exclusion criteria

1. evidence of MS exacerbation in the 4 weeks prior to starting the study 2. any orthopedic, cardiopulmonary, or non-MS neurologic symptoms that will interfere with their ability to participate in the study

As registered. Criteria can change, so ask the trial team or your neurologist.

About this trial

In the sponsor's words

The purpose of this study is to find effective physical therapy treatments for individuals who have severe multiple sclerosis. Physical therapy treatments for mild-to-moderate multiple sclerosis exists, however, very limited research has been done for physical therapy for severe multiple sclerosis (MS). In this study 10 participants diagnosed with severe MS will engage in 1-hour physical therapy sessions twice a week for 6 weeks to address limitations in standing, balancing, and bed mobility.

Papers

Loading reviews and guidelines…

History

    1. Started

      Jul 2024

    2. Main results due

      Dec 2025

    3. Finished

      Jan 2026

    Assembled by software from public sources.